test: trigger tests and slither wokflow #86
main.yml
on: pull_request
deps
11s
get-changed-files
3s
tests
8m 12s
Matrix: slither
Annotations
8 errors
slither (lazy-imt)
The job was canceled because "lazytower" failed.
|
slither (imt)
The job was canceled because "lazytower" failed.
|
slither (imt)
The operation was canceled.
|
slither (lean-imt)
The job was canceled because "lazytower" failed.
|
slither (lean-imt)
The operation was canceled.
|
slither (excubiae)
The job was canceled because "lazytower" failed.
|
slither (excubiae)
The operation was canceled.
|
tests
Process completed with exit code 1.
|
Artifacts
Produced during runtime
Name | Size | |
---|---|---|
all-artifacts
Expired
|
1.23 MB |
|