test: trigger tests and slither wokflow #89
main.yml
on: pull_request
deps
7s
get-changed-files
4s
tests
2m 16s
Matrix: slither
Annotations
11 errors
slither (imt)
Process completed with exit code 1.
|
slither (lazy-imt)
The job was canceled because "imt" failed.
|
slither (lazy-imt)
Process completed with exit code 1.
|
slither (excubiae)
The job was canceled because "imt" failed.
|
slither (excubiae)
The operation was canceled.
|
slither (lean-imt)
The job was canceled because "imt" failed.
|
slither (lean-imt)
The operation was canceled.
|
slither (lazytower)
The job was canceled because "imt" failed.
|
slither (lazytower)
The operation was canceled.
|
tests
Canceling since a higher priority waiting request for 'main-trigger-slither' exists
|
tests
The operation was canceled.
|
Artifacts
Produced during runtime
Name | Size | |
---|---|---|
all-artifacts
Expired
|
1.23 MB |
|