Skip to content

Merge branch 'main' into issue_581_get_column_pair_plot #1832

Merge branch 'main' into issue_581_get_column_pair_plot

Merge branch 'main' into issue_581_get_column_pair_plot #1832

Re-run triggered June 25, 2024 16:02
Status Cancelled
Total duration 1m 53s
Artifacts

integration.yml

on: push
Matrix: integration
Fit to window
Zoom out
Zoom in

Annotations

20 errors
integration (3.12, ubuntu-latest)
The job was canceled because "macos-latest_3_12" failed.
integration (3.12, ubuntu-latest)
The operation was canceled.
integration (macos-latest, 3.8)
The job was canceled because "macos-latest_3_12" failed.
integration (macos-latest, 3.8)
[notice] A new release of pip is available: 21.1.1 -> 24.1 [notice] To update, run: python3.8 -m pip install --upgrade pip
integration (macos-latest, 3.8)
The operation was canceled.
integration (3.12, windows-latest)
The job was canceled because "macos-latest_3_12" failed.
integration (3.12, windows-latest)
The operation was canceled.
integration (3.11, ubuntu-latest)
The job was canceled because "macos-latest_3_12" failed.
integration (3.11, ubuntu-latest)
The operation was canceled.
integration (3.10, windows-latest)
The job was canceled because "macos-latest_3_12" failed.
integration (3.10, windows-latest)
The operation was canceled.
integration (3.9, windows-latest)
The job was canceled because "macos-latest_3_12" failed.
integration (3.9, windows-latest)
The operation was canceled.
integration (3.11, windows-latest)
The job was canceled because "macos-latest_3_12" failed.
integration (3.11, windows-latest)
The operation was canceled.
integration (3.10, ubuntu-latest)
The job was canceled because "macos-latest_3_12" failed.
integration (3.10, ubuntu-latest)
The operation was canceled.
integration (3.8, windows-latest)
The job was canceled because "macos-latest_3_12" failed.
integration (3.8, windows-latest)
The operation was canceled.
integration (macos-latest, 3.12)
Process completed with exit code 1.