Skip to content

Finalize date on changelog for 2.17.0 (#14714) #10014

Finalize date on changelog for 2.17.0 (#14714)

Finalize date on changelog for 2.17.0 (#14714) #10014

Triggered via push October 10, 2024 15:30
Status Failure
Total duration 2h 38m 10s
Artifacts 3
Check for go-ethereum dependency bump
0s
Check for go-ethereum dependency bump
Check if the job should run
0s
Check if the job should run
Matrix: Check images used as test dependencies exist in ECR
Build Chainlink Image
4m 33s
Build Chainlink Image
Get Latest EVM Implementation's Images
18s
Get Latest EVM Implementation's Images
Prepare Compatibility Matrix
11s
Prepare Compatibility Matrix
Start Slack Thread
3s
Start Slack Thread
Parse Test Results
1m 4s
Parse Test Results
Matrix: post-test-results-to-slack
Aggregated test results
18s
Aggregated test results
Fit to window
Zoom out
Zoom in

Annotations

3 errors
log_poller compatibility with thorax/erigon:v2.59.1
Process completed with exit code 1.
vrfv2plus compatibility with ghcr.io/paradigmxyz/reth:v1.0.7
Process completed with exit code 1.
vrfv2plus compatibility with ghcr.io/paradigmxyz/reth:v1.0.6
Process completed with exit code 1.

Artifacts

Produced during runtime
Name Size
log_poller-thorax-erigon-v2-59-1-test-logs
7.28 MB
vrfv2plus-ghcr-io-paradigmxyz-reth-v1-0-6-test-logs
89 KB
vrfv2plus-ghcr-io-paradigmxyz-reth-v1-0-7-test-logs
83.7 KB