Skip to content

Handle V2 Malfeasance proofs in V2 ATX handler #19693

Handle V2 Malfeasance proofs in V2 ATX handler

Handle V2 Malfeasance proofs in V2 ATX handler #19693

Triggered via pull request July 13, 2024 23:38
Status Failure
Total duration 32m 47s
Billable time 36m
Artifacts

ci.yml

on: pull_request
filter-changes
2s
filter-changes
Matrix: build-tools
Matrix: build
Matrix: unittests
ci-status
2s
ci-status
Fit to window
Zoom out
Zoom in

Annotations

20 errors and 1 warning
build-tools (windows-2022)
early EOF
build-tools (windows-2022)
fetch-pack: invalid index-pack output
build-tools (windows-2022)
early EOF
build-tools (windows-2022)
fetch-pack: invalid index-pack output
build-tools (windows-2022)
early EOF
build-tools (windows-2022)
fetch-pack: invalid index-pack output
build-tools (windows-2022)
The process 'C:\Program Files\Git\bin\git.exe' failed with exit code 128
build-tools (self-hosted, macOS, ARM64, go-spacemesh)
The job was canceled because "windows-2022" failed.
build-tools (self-hosted, macOS, ARM64, go-spacemesh)
The operation was canceled.
build-tools (ubuntu-latest-arm-8-cores)
The job was canceled because "windows-2022" failed.
build-tools (ubuntu-latest-arm-8-cores)
The operation was canceled.
build-tools (ubuntu-22.04)
The job was canceled because "windows-2022" failed.
build-tools (ubuntu-22.04)
The operation was canceled.
build-tools (macos-13)
The job was canceled because "windows-2022" failed.
build-tools (macos-13)
The operation was canceled.
unittests (ubuntu-latest-arm-8-cores)
Process completed with exit code 2.
unittests (windows-2022)
The job was canceled because "ubuntu-latest-arm-8-cores" failed.
unittests (windows-2022)
The operation was canceled.
ci-status
Process completed with exit code 1.
filter-changes
Unexpected input(s) 'predicate-quantifier', valid inputs are ['token', 'working-directory', 'ref', 'base', 'filters', 'list-files', 'initial-fetch-depth']