feat: new color scheme #5471
test.yml
on: pull_request
Build backend 🏗️
5m 10s
Build frontend 🏗️
5m 25s
Install E2E dependencies ⬇️
2m 3s
Frontend static check 🪲
2m 37s
E2E Static Check 🪲
48s
Ktlint 🪲
45s
Matrix: BT 🔎
Matrix: E2E testing 🔎
Annotations
3 errors
E2E testing 🔎 (15, 1)
Final attempt failed. Child_process exited with error code 1
|
E2E testing 🔎 (15, 0)
Final attempt failed. Child_process exited with error code 1
|
BT 🔎 (server-app:runStandardTests)
The runner has received a shutdown signal. This can happen when the runner service is stopped, or a manually started runner is canceled.
|
Artifacts
Produced during runtime
Name | Size | |
---|---|---|
backend
Expired
|
154 MB |
|
backend_test_reports_
Expired
|
11.1 MB |
|
e2e
Expired
|
624 KB |
|
e2e_deps
Expired
|
193 MB |
|
e2e_server_log_0
Expired
|
33.1 MB |
|
e2e_server_log_1
Expired
|
35.7 MB |
|
webapp
Expired
|
17.2 MB |
|