Skip to content

Pre Release

Pre Release #325

Triggered via workflow run October 8, 2024 15:03
@JezurkoJezurko
completed dd8528a
Status Failure
Total duration 1h 33m 12s
Artifacts 9

prerelease.yml

on: workflow_run
Matrix: Pre Release
Matrix: Run Linux kernel test suite
Matrix: Run LLVM test suite
Matrix: Run SV-Comp test suite
Matrix: Convert Linux Kernel benchmark results to Markdown
Matrix: Eval LLVM Singlesource results
Matrix: Eval SV-Comp test results
Matrix: Build VAST doc
Fit to window
Zoom out
Zoom in

Annotations

6 errors
Run LLVM test suite (19, 22.04, hl, ON)
Process completed with exit code 2.
Run LLVM test suite (19, 22.04, hl, OFF)
Process completed with exit code 2.
Run LLVM test suite (19, 22.04, bin, OFF)
The job running on runner GitHub Actions 188 has exceeded the maximum execution time of 60 minutes.
Run LLVM test suite (19, 22.04, bin, OFF)
The operation was canceled.
Run LLVM test suite (19, 22.04, llvm, OFF)
The job running on runner GitHub Actions 97 has exceeded the maximum execution time of 60 minutes.
Run LLVM test suite (19, 22.04, llvm, OFF)
The operation was canceled.

Artifacts

Produced during runtime
Name Size
VAST Expired
69.6 MB
linux_kernel_times.md Expired
30.1 KB
results-llvm-ts-hl Expired
55.9 KB
results-llvm-ts-hl-with-unsup Expired
56.7 KB
results-sv-hl Expired
123 KB
results-sv-hl-with-unsup Expired
124 KB
sv-comp-results Expired
2.35 KB
vast_linux_kernel_times_hl_with_unsup.tsv Expired
22.1 KB
vast_linux_kernel_times_hl_without_unsup.tsv Expired
16.9 KB