pr-builder-test #7684
Annotations
5 errors and 3 warnings
build
The job running on runner GitHub Actions 20 has exceeded the maximum execution time of 360 minutes.
|
build
Java heap space
|
build
Java heap space
|
build
Java heap space
|
build
The operation was canceled.
|
build
Build ran for PR https://github.com/wso2/carbon-multitenancy/pull/281
|
build
===========================================================
carbon-multitenancy BUILD SUCCESS
==========================================================
Built version: 4.11.30-SNAPSHOT
|
build
No files were found with the provided path: carbon-multitenancy/**/surefire-reports. No artifacts will be uploaded.
|
Artifacts
Produced during runtime
Name | Size | |
---|---|---|
product-is-mvn-build-log
|
812 KB |
|
product-is-surefire-report
|
120 KB |
|
repo-mvn-build-log
|
53.4 KB |
|
repo-pr-diff
|
370 Bytes |
|