Skip to content

Update clUpdateMutableCommandsKHR binding #58

Update clUpdateMutableCommandsKHR binding

Update clUpdateMutableCommandsKHR binding #58

Triggered via pull request August 1, 2024 08:49
Status Failure
Total duration 12m 3s
Artifacts

presubmit.yml

on: pull_request
Matrix: android
Matrix: linux
Matrix: macos
Matrix: windows
Fit to window
Zoom out
Zoom in

Annotations

8 errors
macos (gcc-11, g++-11, Ninja Multi-Config, 17)
Process completed with exit code 1.
macos (gcc-11, g++-11, Ninja Multi-Config, 11)
The job was canceled because "gcc-11_g__-11_Ninja_Mul_2" failed.
macos (/usr/bin/clang, /usr/bin/clang++, Ninja Multi-Config, 17)
The job was canceled because "gcc-11_g__-11_Ninja_Mul_2" failed.
macos (/usr/bin/clang, /usr/bin/clang++, Ninja Multi-Config, 17)
The operation was canceled.
macos (/usr/bin/clang, /usr/bin/clang++, Xcode, 11)
The job was canceled because "gcc-11_g__-11_Ninja_Mul_2" failed.
macos (/usr/bin/clang, /usr/bin/clang++, Xcode, 11)
The operation was canceled.
macos (/usr/bin/clang, /usr/bin/clang++, Xcode, 17)
The job was canceled because "gcc-11_g__-11_Ninja_Mul_2" failed.
macos (/usr/bin/clang, /usr/bin/clang++, Xcode, 17)
The operation was canceled.