Update clUpdateMutableCommandsKHR binding #58
presubmit.yml
on: pull_request
Matrix: android
Matrix: linux
Matrix: macos
Matrix: windows
Annotations
8 errors
macos (gcc-11, g++-11, Ninja Multi-Config, 17)
Process completed with exit code 1.
|
macos (gcc-11, g++-11, Ninja Multi-Config, 11)
The job was canceled because "gcc-11_g__-11_Ninja_Mul_2" failed.
|
macos (/usr/bin/clang, /usr/bin/clang++, Ninja Multi-Config, 17)
The job was canceled because "gcc-11_g__-11_Ninja_Mul_2" failed.
|
macos (/usr/bin/clang, /usr/bin/clang++, Ninja Multi-Config, 17)
The operation was canceled.
|
macos (/usr/bin/clang, /usr/bin/clang++, Xcode, 11)
The job was canceled because "gcc-11_g__-11_Ninja_Mul_2" failed.
|
macos (/usr/bin/clang, /usr/bin/clang++, Xcode, 11)
The operation was canceled.
|
macos (/usr/bin/clang, /usr/bin/clang++, Xcode, 17)
The job was canceled because "gcc-11_g__-11_Ninja_Mul_2" failed.
|
macos (/usr/bin/clang, /usr/bin/clang++, Xcode, 17)
The operation was canceled.
|