Skip to content

Extended test with big messages and 1:n and n:1 tests #125

Extended test with big messages and 1:n and n:1 tests

Extended test with big messages and 1:n and n:1 tests #125

Triggered via push November 20, 2024 12:43
Status Failure
Total duration 1m 5s
Artifacts 2

build-ubuntu.yml

on: push
Matrix: build-ubuntu
Fit to window
Zoom out
Zoom in

Annotations

13 errors
build-ubuntu (static, ubuntu-20.04)
Process completed with exit code 8.
build-ubuntu (shared, ubuntu-20.04)
The job was canceled because "static_ubuntu-20_04" failed.
build-ubuntu (object, ubuntu-24.04)
The job was canceled because "static_ubuntu-20_04" failed.
build-ubuntu (static, ubuntu-24.04)
The job was canceled because "static_ubuntu-20_04" failed.
build-ubuntu (static, ubuntu-24.04)
The operation was canceled.
build-ubuntu (object, ubuntu-22.04)
The job was canceled because "static_ubuntu-20_04" failed.
build-ubuntu (object, ubuntu-22.04)
The operation was canceled.
build-ubuntu (shared, ubuntu-22.04)
The job was canceled because "static_ubuntu-20_04" failed.
build-ubuntu (shared, ubuntu-22.04)
The operation was canceled.
build-ubuntu (static, ubuntu-22.04)
The job was canceled because "static_ubuntu-20_04" failed.
build-ubuntu (static, ubuntu-22.04)
The operation was canceled.
build-ubuntu (shared, ubuntu-24.04)
The job was canceled because "static_ubuntu-20_04" failed.
build-ubuntu (shared, ubuntu-24.04)
The operation was canceled.

Artifacts

Produced during runtime
Name Size
tcp_pubsub-1.0.5-ubuntu-20.04-shared
180 KB
tcp_pubsub-1.0.5-ubuntu-22.04-shared
179 KB