Skip to content

ref(metrics): Remodel metric submission flow #14696

ref(metrics): Remodel metric submission flow

ref(metrics): Remodel metric submission flow #14696

Triggered via pull request July 26, 2024 08:30
Status Cancelled
Total duration 7m 19s
Artifacts

ci.yml

on: pull_request
Setup build metadata
0s
Setup build metadata
Lint
2m 51s
Lint
Lint Rust Default Features
1m 19s
Lint Rust Default Features
Test All Features (ubuntu-latest)
3m 38s
Test All Features (ubuntu-latest)
Test Python
1m 4s
Test Python
Integration Tests
6m 50s
Integration Tests
Matrix: test
Matrix: Build Relay Binary
Matrix: Build Docker Image
Sentry-Relay Integration Tests
0s
Sentry-Relay Integration Tests
self-hosted-end-to-end
0s
self-hosted-end-to-end
Matrix: Upload build artifacts to gocd
Matrix: Publish Relay to DockerHub
Matrix: Publish Relay to GCR
Fit to window
Zoom out
Zoom in

Annotations

5 errors
Lint
Process completed with exit code 101.
Build Relay Binary (relay, x86_64-unknown-linux-gnu)
Canceling since a higher priority waiting request for 'CI-dav1d/flushbuckets-perf' exists
Build Relay Binary (relay, x86_64-unknown-linux-gnu)
The operation was canceled.
Integration Tests
Canceling since a higher priority waiting request for 'CI-dav1d/flushbuckets-perf' exists
Integration Tests
The operation was canceled.