Skip to content

[CI] Skip dev-igc run if the PR has ci-no-devigc label specified #2338

[CI] Skip dev-igc run if the PR has ci-no-devigc label specified

[CI] Skip dev-igc run if the PR has ci-no-devigc label specified #2338

Triggered via pull request September 6, 2024 16:27
Status Cancelled
Total duration 5m 54s
Artifacts

sycl-post-commit.yml

on: pull_request
Linux (Self build + no-assertions)  /  Build + LIT
5m 45s
Linux (Self build + no-assertions) / Build + LIT
build-win  /  Build + LIT
0s
build-win / Build + LIT
Matrix: e2e-lin
Waiting for pending jobs
e2e-win  /  run
e2e-win / run
Fit to window
Zoom out
Zoom in

Annotations

4 errors
build-win / Build + LIT
The run was canceled by @uditagarwal97.
macOS / Build
The run was canceled by @uditagarwal97.
Linux (Self build + no-assertions) / Build + LIT
The run was canceled by @uditagarwal97.
Linux (Self build + no-assertions) / Build + LIT
The operation was canceled.