Skip to content

chore: integrate the new CP and the new VL #1056

chore: integrate the new CP and the new VL

chore: integrate the new CP and the new VL #1056

Triggered via pull request October 5, 2023 13:31
Status Cancelled
Total duration 1h 29m 39s
Artifacts 2

continuous-integration.yaml

on: pull_request
matrix-preparation
4s
matrix-preparation
Start EC2 runner
2m 33s
Start EC2 runner
Matrix: build-macos
Matrix: build-linux
Stop EC2 runner
6s
Stop EC2 runner
Linux build status
9s
Linux build status
Send Slack notification
12s
Send Slack notification
Fit to window
Zoom out
Zoom in

Annotations

5 errors
build-linux (linux, e6cid, 3.8)
Canceling since a higher priority waiting request for 'refs/pull/339/merge-pull_request-CML builds (weekly or not)' exists
build-linux (linux, e6cid, 3.8)
WARNING: Running pip as the 'root' user can result in broken permissions and conflicting behaviour with the system package manager. It is recommended to use a virtual environment instead: https://pip.pypa.io/warnings/venv
build-linux (linux, e6cid, 3.8)
Process completed with exit code 1.
build-linux (linux, e6cid, 3.8)
The operation was canceled.
Linux build status
Process completed with exit code 1.

Artifacts

Produced during runtime
Name Size
html-docs Expired
12.4 MB
py3-wheel Expired
196 KB