Skip to content

2018 06 26

Andre Merzky edited this page Jun 26, 2018 · 2 revisions

Agenda / Notes

- use cases -> requirements -> architecture -> implementation -> testing -> release
- Milestones:
  - Use cases, Requirements (early April)
  - Feasibility, Prototype  (early June )
  - Implementation          (end   June )

  • updates:
    • Team 1: Ioannis, Jumana
      • ticket
      • use case document
      • TODO Will: tests for slurm LRMS (other LRMS missing)
      • JD: data from BW
        • TODO: use an RP script (BoT df /tmp/) to get LSF size out of band
        • goal: conceptual solution, possibly prototype
      • node failure rates are not public (specifically comet)
      • JD: htbac use case scalable in size, needs ENTK tagging
      • JD: lfs inspection drift drafted
    • Team 2: Vivek, Srinivas, George
      • literature study
      • ongoing work on integration tests
      • all tests are passing
      • repex use case progressing
    • toward integration
      • sync with devel
      • reviews


Clone this wiki locally